We utilized a reciprocating saw to slice the rails over the stile that could frame the side that is right of dishwasher.

We utilized a reciprocating saw to slice the rails over the stile that could frame the side that is right of dishwasher.

We also slice the flooring for the case in two aided by the reciprocating saw.

Aided by the cabinet cleats removed as well as the rails take off, we had been in a position to go the beds base case that supported the club area.

We included a brand new strong-back along the whole sink wall to guide the latest countertop and also to complete the space where we relocated the cabinets away.

Going the club case exposed a portion of the ground which had no flooring. We included underlayment where required and used a multipurpose fix element to smooth the transitions out into the underlayment.

We used a Porter Cable random orbit sander to smooth a floor fix when preparing for plastic.

After dry-fitting the sheet plastic when it comes to floor fix, we utilized a trowel utilizing the depth that is appropriate to distribute the plastic floor adhesive. We carefully placed the sheet plastic within the fix area and utilized a damp cloth to smooth the adhesive out beneath the plastic repair area. Then we cleaned up the surplus vinyl adhesive that escaped out of the seams.

After doing a floor fix, the bar was moved by us case back to place. We examined to ensure that the level through the wall surface ended up being 24 ins out to your real face frame therefore it matched one other base case.

We additionally checked the side-to-side opening for the dishwasher, which must be 24 ins, then leveled the case along with the rest of this base cabinets, anchored it to your wall surface also to a floor.

We utilized 3/4-inch CDX plywood to build the countertop decks. We made the club countertop two complete tiles wide.

My son, Tim, discovered some floor that is 12-inch to make use of for the countertop. He utilized 1/4-inch spacers to dry-fit the tiles before establishing them.

We utilized a router with helpful tips connected to the base to cut a tiny rabbet in the within, upper part associated with the lumber self-edge.

We utilized a two-part, epoxy-based, stain-resistant grout when it comes to tiles. Shown right right here, the colored sand is being included with the fluid part of the mix. This kind of grout is simply too gluey to grout the tile by smearing it totally over the face associated with the tile into place using a window squeegee so we tried to keep the grout close to the grout lines and pressed them.

We’d intends to work with a backsplash that went through the countertop as much as the wall case. This allowed a good amount of space for accessing the stud bay close to a current j-box that is electrical operating an innovative new circuit for the dishwasher and a disposal.

A T-connection was set up during the water end regarding the hot part to provide water to your dishwasher and also to the sink.

A 3/4-inch opening drilled read here toward the rear of the wall surface, between your sink case additionally the dishwasher, offered the opening for the supply line.

We threaded the appropriate size connector to the base associated with the dishwasher that will fit both the threads in the dishwasher as well as the threads regarding the end associated with the warm water supply line.

We connected the dishwasher drain line to your exhaust slot from the dishwasher before bringing it in to the home. A couple of channel-lock style pliers is useful to place the hose clamp springtime into location for the dishwasher drain. With all the supply line suitable in position from the dishwasher and also the drain hose connected, the dishwasher was brought by us in to the kitchen area. We put the dishwasher within the opening, routed the drain line in to the sink starting and attached the exhaust end for the drain line to your pipe that is proper the top of the disposal.

Arbeitsschritt

Kurzbeschreibung

Detaillierte Beschreibung

Transfer und Erfahrung

Medien

Autor: Beispiel Systemspezialist

Entwicklung eines neuen Steuerungs- und Regelungssystems für die messtechnischen Innovationen des Kunden. Grundlage ist das bestehende Steuerungssystem, das um Komponenten erweitert wird. Wesentliche Anforderungen ergeben sich aus den zusätzlichen Funktionen der Anlagen, aber auch aus rechtlichen Regelungen.

Kontaktinfo

Über das betriebliche Projekt

Beschreiben Sie kurz Ihr betriebliches Projekt, das Sie in der Weiterbildung zum Spezialisten dokumentieren.

Schreibe einen Kommentar

Deine E-Mail-Adresse wird nicht veröffentlicht. Erforderliche Felder sind mit * markiert.